Delivery: building sites are hard on joinery.
Because sites can damage joinery and delicate finishes, SRS plans delivery carefully.
4.1
Safe storage
SRS assesses site constraints in advance and may schedule piece-by-piece deliveries.
- Is there space to store the pieces?
- How much protection is needed?
- Can access lifts handle the largest piece?
4.2
Installation
SRS makes installation as straightforward as possible and makes sure your contractors know the correct installation method.
- Straightforward installation by design
- Contractors briefed on the method
Will the biggest piece fit through the lift? Ask before it is built.